Industry All Risks
FIRE LOSS OF RS. 4.5 CRORE

CLIENT'S SITUATION

pexels-anna-kester-5352942.jpg

A major fire occurred at our client’s plant resulting in substantial losses to the client.

The claim was totally rejected by the PSU Insurer on the ground that a different RISK CODE was applicable to the loss (treating some of the material lying in the factory as hazardous) and claimed that more flammable material than the allowed limit was found in the factory at the time of loss.

The client was not at all happy with the rejection and our team presented the case to the Insurer and helped the client in getting the claim amount.

WHAT WE DELIVERED

We took up the case and fought it up to the HO level by making presentations on the terms and conditions of the insurance policy. We successfully managed to get the claim amount for the client.